KEN-BETWA INTER-LINKING PROJECT

KEN-BETWA INTER-LINKING PROJECT

  • It is the first project under the National Perspective Plan for interlinking of rivers.
  • It envisages transferring water from the Ken River to the Betwa river, both tributaries of the Yamuna. The Ken-Betwa Link Canal will be 221 km long, including a 2-km long tunnel.
  • The project has two phases, with mainly four components.
  • Phase-I will involve one of the components — Daudhan Dam complex and its subsidiary units such as Low Level Tunnel, High Level Tunnel, Ken-Betwa Link Canal and power houses.
  • Phase-II will involve three components — Lower Orr Dam, Bina Complex Project and Kotha Barrage. According to the Jal Shakti Ministry, the project is expected to provide annual irrigation of 10.62 lakh hectares, supply drinking water to about 62 lakh people, and generate 103 MW of hydropower and 27 MW of solar power.

Contact Us

    Enquire Now